This is a responsible, managerial, and supervisory position reporting to the Director of Facilities Management. UW-Green Bay’s Heating Plant primary equipment consists of three (3) high pressure steam water tube boilers, two (2) high pressure circulatic steam generating boilers, two (2) electrical chillers, one (1) steam centrifical chiller, and one (1) diesel fired generator. Equipment associated with the boilers, chillers and generator include pumps, motors, fans, dampers, monitoring equipment, gauges, energy/mechanical control system (American Automatrix and Foxborough Controls). This position will supervise five (5) Operators and one (1) Operator-in-Charge. Job duties of this position are performed with a minimum of direction. This position understands that the operation of the Heating and Cooling Plant is a 365/24/7 staffed department.
For more information and position responsibilities, please see the full position announcement.
To ensure consideration, please submit application materials by Sunday, January 10, 2016.